| 标准号 & 类别 | 标准名称 | 发布 |
|---|---|---|
| ANSI C119.5-2009 试验 |
绝缘刺穿连接器系统,额定电压小于等于600 V(低压高空捆扎电缆与绝缘和非绝缘线路导线) Insulation Piercing Connector Systems, rated 600 volts or less (low voltage aerial bundled cables and insulated and non-insulated line wires)
跳线 |
2009 美国国家标准学会 |
| ANSI C119.5-2018 试验 |
绝缘刺穿连接器系统,额定电压小于等于600 V(低压高空捆扎电缆与绝缘和非绝缘线路导线) Insulation Piercing Connector Systems, rated 600 volts or less (low voltage aerial bundled cables and insulated and non-insulated line wires)
控制电缆 |
2018-1-1 美国国家标准学会 |
| BS EN 50483-1:2026 试验 |
Test requirements for low voltage aerial bundled cable accessories - Part 1: Generalities
悬垂线夹 |
2026-04-30 |
| BS EN 50483-5:2009 试验 |
Test requirements for low voltage aerial bundled cable accessories — Part 5: Electrical ageing test
架空绞线 |
2009-03-31 英国标准学会 |
| BS EN 50483-5:2026 试验 |
Test requirements for low voltage aerial bundled cable accessories - Part 5: Electrical ageing test
架空绞线 热循环 |
2026-04-30 |
| DIN EN IEC 61238-1-2:2020 试验/规范 |
Compression and mechanical connectors for power cables - Part 1-2: Test methods and requirements for insulation piercing connectors for power cables for rated voltages up to 1 kV (Um = 1,2 kV) tested on insulated conductors (IEC 61238-1-2:2018); German ve
电力电缆 |
2020-11-01 德国标准化学会 |
| IEC 61238-1-2:2018 试验 |
电力电缆用压缩连接器和机械连接器.第1-2部分:在绝缘导体上试验的额定电压1kV(Um=1.2kV)以下电力电缆用绝缘穿孔连接器的试验方法和要求 Compression and mechanical connectors for power cables - Part 1-2: Test methods and requirements for insulation piercing connectors for power cables for rated voltages up to 1 kV (Um = 1,2
机械连接器 |
2018-05-08 国际电工委员会 |
| IEEE 2780-2019 规范标准 |
IEEE Standard for Insulation-Piercing Connectors
|
2019-1-1 美国电气电子工程师学会 |
| IEEE Std 2780-2019 规范标准 |
IEEE Standard for Insulation-Piercing Connectors
架空绝缘电缆 电气测试 |
2019-07-17 美国电气电子工程师学会 |
| LST EN IEC 61238-1-2:2019 试验 |
可挤压和机械紧固的电力电缆连接 第1-2部分 额定电压不超过 1 kV(Um = 1.2 kV)的电力电缆穿透绝缘连接的试验方法和要求 针对绝缘导体进行测试 Compression and mechanical connectors for power cables - Part 1-2: Test methods and requirements for insulation piercing connectors for power cables for rated voltages up to 1 kV (Um = 1,2 kV) tested on insulated conductors (IEC 61238-1-2:2018)
热循环测试 |
2019-12-31 立陶宛标准局 |
| NF C33-045-4*NF EN 50483-4:2009 试验 |
Test requirements for low voltage aerial bundled cable accessories - Part 4 : connectors.
|
2009-07-01 法国标准化协会 |
| NF EN IEC 61238-1-2:2019 规范标准 |
电力电缆用压接和机械连接器 第1-2部分:额定电压不超过1kV(Um=1.2kV)电力电缆用绝缘穿刺连接器的测试方法和要求 Compression and mechanical connectors for power cables - Part 1-2: Test methods and requirements for insulation piercing connectors for power cables for rated voltages up to 1 kV (Um = 1,2 kV) tested on insulated conductors
|
2019-09-01 法国标准化协会 |
| UNE-EN 50483-5:2009 试验标准 |
Test requirements for low voltage aerial bundled cable accessories -- Part 5: Electrical ageing test (Endorsed by AENOR in April of 2011.)
|
2011-04-01 西班牙标准化协会 |
| VDE 0278-483-1 E*DIN EN 50483-1:2008-09 试验 |
Test requirements for low voltage aerial bundled cable accessories – Part 1: Generalities
架空绝缘电缆 |
2008-09-01 德国电气,电子和信息技术协会 |
| VDE 0278-483-4 E*DIN EN 50483-4:2008-09 试验 |
Test requirements for low voltage aerial bundled cable accessories – Part 4: Connectors
架空绝缘电缆 |
2008-09-01 德国电气,电子和信息技术协会 |
| VDE 0278-483-5 E*DIN EN 50483-5:2008-09 试验 |
Prüfanforderungen für Bauteile für isolierte Niederspannungsfreileitungen – Teil 5: Elektrische Alterungsprüfungen
架空绝缘电缆 |
2008-09-01 德国电气,电子和信息技术协会 |
Copyright ?2007-2026 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号
页面更新时间: 2026-05-07 12:38