美利体育登录入口官网:ISO/TR 22400-10:2018
自动化系统和集成.制造操作管理的关键性能指标(KPI).第10部分:数据采集的操作顺序描述

Automation systems and integration - Key performance indicators (KPIs) for manufacturing operations management - Part 10: Operational sequence description of data acquisition


Introduction to ISO/TR 22400-10:2018

This technical report provides detailed methodologies for calculating Key Performance Indicators (KPIs) in manufacturing operations management, specifically focusing on data acquisition processes as outlined in ISO 22400-2. It serves as a practical companion to theoretical definitions, offering step-by-step examples across various manufacturing scenarios.


Core KPI Categories and Calculations

Scope Key KPIs Calculation Basis
Work Unit OEE, Availability, MTBF Work unit log events and timestamps
Production Orders Throughput rate, First Pass Yield Order sequence execution data
Workers Operator efficiency Attendance vs. productive time

Technical Implementation Framework

美利体育登录入口官网:Data Acquisition Process

The standard mandates recording of:

  • APT (Actual Production Time): Machine runtime for value-adding activities
  • AUST (Actual Unit Setup Time): Configuration periods between batches
  • ADET (Actual Unit Delay Time): Unplanned stoppages

Example from Table 1 shows W1 accumulated 390 minutes APT with 150 minutes ADET, yielding 72.22% technical efficiency.


Energy Efficiency Metrics

Innovative KPIs address sustainability:

Metric Formula Work Unit W1 Example
Direct Energy Consumption Effectiveness (Planned Energy × PQ)/Actual Energy 88.68%
Net Energy Efficiency Actual Energy/GQ 0.540 kWh/piece

Implementation Recommendations

  1. Establish automated data collection systems for work unit logs with minimum 30-second granularity
  2. Implement serialized tracking for First Pass Yield calculations in discrete manufacturing
  3. Use Annex A's energy measurement framework for sustainability reporting
  4. Conduct baseline assessments using the provided calculation examples before full deployment

 

请注意,本内容不等同于标准原文,内容仅供参考,本站不保证内容的正确性。准确、完整的信息请参阅正式版文本。

 

 

ISO/TR 22400-10:2018

点击查看大图

标准号
ISO/TR 22400-10:2018
发布
2018年
ICS
25.040.01
总页数
42页
中文版
GB/Z 34044.10-2020 (等同采用的中文版本)
发布单位
国际标准化组织
当前最新
ISO/TR 22400-10:2018
 
 
引用标准
ISO 22400-2:2014
 
 
本体
工作单元
术语 
计划停机时间 Planned Shutdown Time (PST)
计划 downtime Planned Downtime (PDOT)

美利体育登录入口官网: ISO/TR 22400-10:2018 中提到的仪器美利体育官网首页网址

工作单元日志记录系统
用于记录工作单元事件及其时间戳的数据系统