| 标准号 & 类别 | 标准名称 | 发布 |
|---|---|---|
| AGFW FW 401-1 A E:2018-08 规范 |
直接埋地塑料保温管(KMR)作为远距离供暖管道系统的设计导则 Pipe system of factory made and thermal insulated pipe elements for district heating – scope, structure, definitions
区域供热 |
2018-08-01 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-1 A:2007-12 规范 |
AGFW作业指导书 FW 401-部分1:远距离供热管网中聚乙烯保温管的铺设与静力 AGFW-Technical Guide FW 401-Part 1: Installation and calculation of preinsulated bonded pipes for district heating networks
|
2007-12 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-10 A:2007-12 规范 |
安装和计算预绝缘捆绑管道用于热网 静态设计 应力分析的基本原理 Basic principles of installation and calculation of pre-insulated bundled pipes for static design stress analysis of heating networks
膨胀节 |
2007-12 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-11 A:2007-12 规范 |
Plastic insulation pipe (KMR) for heating network - statics; calculation charts
|
2007-12 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-14 A:2007-12 规程 |
Installation and calculation of preinsulated bonded pipes for district heating networks – Installation; joint construction -
|
2007-12 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-15 A:2007-12 规程 |
Installation and calculation of preinsulated bonded pipes for district heating networks – operation
区域供热网络 |
2007-12-01 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-17 A:2007-12 规范 |
Installation and calculation of preinsulated bonded pipes for district heating networks – quality assurance
|
2007-12-01 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-8 A E:2018-08 试验 |
Pipeline system monitoring system consisting of pipe sections and thermally insulated pipe fittings
|
2018-08 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-8 A:2007-12 规程 |
Installation and calculation of preinsulated bonded pipes for district heating networks - components; surveillance systems
|
2007-12 供暖、制冷和热电联产能源效率协会 |
| AGFW FW 401-9 A:2007-12 规范 |
Installation and calculation of preinsulated bonded pipes for district heating networks - draft and conception
区域供热网络 膨胀节 |
2007-12-01 供暖、制冷和热电联产能源效率协会 |
Copyright ?2007-2026 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号
页面更新时间: 2026-05-07 12:37